Arlington Construction and Weather Data for Cranes and Heavy Equipment

Last reviewed 2026-10-24. Journalists, researchers, and community groups are welcome to cite any figure on this page with attribution and a link.

Arlington's Entertainment District, home to AT&T Stadium, Globe Life Field, Choctaw Stadium, Texas Live!, the Loews hotels and the National Medal of Honor Museum, keeps adding work. In its April 21, 2026 notice on the AT&T Stadium lease extension, the City of Arlington says the Dallas Cowboys will invest a minimum of $750 million in the stadium, finished by 2043, and the City's June 3, 2026 notice announced the old Sheraton's implosion to make way for a 507-room Americana by Loews hotel. This page sets out the published numbers behind projects like these in Arlington and ten nearby cities, along with the heat, wind and storm records that decide which days a crane can work. None of these projects is ours. Every figure belongs to the owner, agency or publisher named beside it, as of the date shown.

Each table row comes from a single publisher and gives that publisher's date, or says that none was printed. Figures from companies, teams and the City are their own statements as of that date; where two of them disagree on the same thing, the table shows one and names it. The weather rows draw on two federal products that are not interchangeable, station data from NOAA's National Centers for Environmental Information (NCEI) and the climate tables of the National Weather Service office in Fort Worth, so every value names its source. The rules these numbers feed, from street permits to FAA notice, are laid out in our Arlington crane permit guide, and the crane rental cost page lists dated price ranges from national guides.

1,225 feet

Span of the steel arches over AT&T Stadium

Walter P Moore, the stadium's structural engineer

$750 million

Minimum the Dallas Cowboys will invest in AT&T Stadium, with completion by 2043

City of Arlington, April 21, 2026

480,000 square feet

E-Space manufacturing and office facility at Arlington Municipal Airport, topped out October 23, 2026

City of Arlington

$2.3 billion

TxDOT's figure for the Southeast Connector, which rebuilds roughly 16 miles of I-20 and I-820 by an estimated 2028

TxDOT

52 days

DFW's 2026 count of days reaching 100 degrees F, provisional and subject to change

NWS Fort Worth/Dallas, updated September 22, 2026

89 mph

Fastest 5-second gust at DFW Airport on 2025-08-04, the highest annual peak in NCEI's 2010-2025 summaries for the station

NOAA NCEI

The Entertainment District by the Numbers

The district's stadiums and museum are long-span steel structures, and the teams, designers and City publish their sizes. The Texas Rangers' Globe Life Field facts page gives a 5.5-acre retractable roof weighing 24 million pounds, and Walter P Moore, AT&T Stadium's structural engineer, gives arches spanning 1,225 feet and a roof supported by 14,100 tons of structural steel. A crane's load chart lowers capacity as the radius grows, so on structures like these the heaviest piece and its distance from the crane choose the machine. Steel at stadium scale calls for crawler cranes or the largest all-terrain cranes, ground mats and a written lift plan. The table lists each venue's published figures, one publisher per row.

Big events bring their own heavy work. The City of Arlington reported on October 15, 2026 that AT&T Stadium hosted nine FIFA World Cup matches with a total attendance of 631,048, and NBC DFW reported on May 14, 2026 that the stadium's general manager put the change to a natural grass pitch at roughly 45,000 man-hours, with 15,000 tons of materials hauled in. The City reported the public opening of the National Medal of Honor Museum on March 25, 2025, and Texas Highways (April 3, 2026) describes its exhibition hall as a 200-by-200-foot steel structure hovering 40 feet above the ground. Event days limit the calendar too. Section 3.1(4) of the City's Right-of-Way Manual reads "No work shall be permitted within the Entertainment District on the business day preceding the date of any event" that qualifies under the Special Events chapter.

Project Published figures Published by Date
AT&T Stadium Steel arches spanning 1,225 feet; roof supported by 14,100 tons of structural steel; 80,000 seats in 3 million square feet; $1.15 billion Walter P Moore, structural engineer (project page) No date shown; project completed 2009
AT&T Stadium arches Each 1,225-foot arch weighs 3,250 tons and rises 292 feet above grade; stadium built in 40 months and eight million worker-hours ENR July 9, 2008
AT&T Stadium, FIFA World Cup 26 Nine matches with a total attendance of 631,048 City of Arlington October 15, 2026
Globe Life Field Retractable roof of 5.5 acres weighing 24 million pounds; 278 feet from the playing field to the top of the roof; 19,000 tons of steel; about 40,300 seats; about $1.2 billion Texas Rangers, Facts & Figures page No date shown; first season 2020
Globe Life Field roof Operable roof steel of about 9,600 tons; about 1,700 workers on site daily with the project about 91 percent complete Texas Rangers construction update January 23, 2020
Loews Arlington Hotel and Arlington Convention Center Nearly $550 million project with a 1,550-space parking garage City of Arlington (groundbreaking notice) October 12, 2021
Loews Arlington Hotel 888 guest rooms and suites in a 21-story resort; 266,000 sq ft of indoor and outdoor meeting and convention space; a 51,000 sq ft ballroom Loews Hotels opening release February 13, 2024
Americana by Loews, former Sheraton site Sheraton implosion set for 8:30 a.m. Saturday, June 6, clearing the site for a 507-room hotel with more than 83,000 sq ft of meeting and event space City of Arlington June 3, 2026
Texas Live! A $250 million dining, entertainment and hospitality district with 200,000 sq ft of retail, dining and entertainment space City of Arlington project page No date shown; written before the 2018 opening
National Medal of Honor Museum Exhibition hall built as a 200-by-200-foot steel structure hovering 40 feet above the ground, on five columns Texas Highways April 3, 2026
National Medal of Honor Museum Opened to the public on March 25 with more than 100,000 sq ft, including 31,000 sq ft of exhibition galleries City of Arlington March 25, 2025
Choctaw Stadium Council approved exterior work with the City paying $4.2 million; the work adds an Arlington police substation and a temporary home for Fire Station No. 8 FOX 4 KDFW April 23, 2024
Tormenta Rampaging Run, Six Flags Over Texas Roller coaster reaching a height of 309 feet, with a 285-foot drop and 4,199 feet of track City of Arlington September 25, 2025

Each row is one publisher's figure as of its date, rounded the way that publisher rounded it. Owners', designers' and the City's numbers are their own statements, and the ENR and FOX 4 rows are news reports. The rows describe the venues; none of them is work of ours.

Arlington's Other Big Builds: Airport, Plants, Schools and Streets

Outside the district, Arlington's large builds sit at the city airport, the GM plant, the hospitals and schools, and the streets. At Arlington Municipal Airport the E-Space job pairs a 480,000-square-foot plant with a 33,450-square-foot hangar, an aircraft apron and an access road, and the City's E-Space topping-out notice of October 23, 2026 estimates completion in summer 2027. Building at the airport takes the City's prior written approval under section 5.2 of its Airport Rules and Regulations. For General Motors' Arlington Assembly plant, opened in 1954, the Arlington Economic Development Corporation's June 9, 2023 repost of GM's announcement lists more than $500 million for new tooling and equipment across the plant's stamping, body shop and general assembly operations.

Public spending is moving on several fronts. Arlington voters renewed the quarter-cent street maintenance sales tax on May 2, 2026, a tax the City says brings in $25 million to $30 million a year, and Arlington ISD voters passed Propositions A and B at the same election, $438,755,000 of it for facility upgrades. Tarrant County College cut the ribbon on the $193 million overhaul of its Southeast Campus on October 7, 2026. The City's 2025 bond package of $200.8 million appears below only as a proposal, because the City's page does not report the election result. A crane or machine that restricts a street or sidewalk on jobs like these needs a Temporary Traffic Control Permit, filed at least five business days ahead under section 6.06 of the Streets and Sidewalks chapter of the City Code.

Project Published figures Published by Date
E-Space plant and hangar, Arlington Municipal Airport 480,000 sq ft manufacturing and office facility, parking, an airport access road, an aircraft apron and a 33,450 sq ft hangar; Arlington EDC sales tax revenues not to exceed $115 million City of Arlington August 27, 2025
E-Space plant Topped out October 23, 2026; over 2,000 jobs expected; completion estimated for summer 2027 City of Arlington October 23, 2026
Advanced Composite Structures, near Arlington Municipal Airport Roughly 40,000 sq ft plant recently built; ACS to invest $4.25 million and create at least 40 jobs by the end of 2032 City of Arlington September 30, 2026
GM Arlington Assembly More than $500 million for new tooling and equipment in stamping, body shop and general assembly; nearly $2 billion in GM investments announced for the plant beginning in 2013 Arlington EDC, reposting GM's announcement June 9, 2023
GM Arlington Assembly Vehicle assembly plant opened in 1954; builds the Chevrolet Tahoe and Suburban, GMC Yukon and Yukon XL, and Cadillac Escalade and Escalade-V General Motors facilities page No date shown
AT&T Stadium lease extension Team to invest a minimum of $750 million, complete by 2043; City to contribute up to $273 million (net present value) over 20 years from venue taxes; lease extended through 2055 City of Arlington April 21, 2026
City of Arlington 2025 bond program (proposed) $200.8 million for 27 projects in five propositions, including $136,995,000 for streets; election called for May 3, 2025; result not shown on the page City of Arlington, Arlington Listens page Council vote of February 4, 2025
Street maintenance sales tax Quarter-cent tax renewed at the May 2, 2026 election with more than 78% of the vote (unofficial), through Dec. 31, 2034; brings in $25 million to $30 million a year City of Arlington May 4, 2026
Trammell Crow Company project, downtown near Abram and Mesquite streets At least 390 market-rate residential units, 31,250 sq ft of office and a 600-space garage; developer to invest at least $123 million, City about $38.4 million; finish by September 2031 City of Arlington September 3, 2026
Anthem, the former Lincoln Square 43-acre redevelopment with 404,000 sq ft of retail, food and beverage, public and entertainment space after 70,000 sq ft of demolition; $135 million+ planned investment; completion slated for early 2028 Arlington EDC August 3, 2026
Medical City Arlington expansion $144 million expansion adding more than 127,000 sq ft and bringing the hospital to 496 beds City of Arlington August 29, 2025
Tarrant County College Southeast Campus $193 million rebuild with 100,000 sq ft of new space and 234,000 sq ft of renovations Tarrant County College October 7, 2026
Arlington ISD Bond 2026 Propositions A ($438,755,000, facilities) and B ($30,955,000, technology) passed May 2, 2026; the 70-year-old South Davis Elementary to be replaced Arlington ISD bond page Newest item September 24, 2026
UTA West, Walsh Ranch at the western edge of Fort Worth (Parker County) 51-acre campus; infrastructure and site work starting in 2026; first class in fall 2028 UT Arlington, quoting the Fort Worth Report No date shown

Each row is the City's, the Arlington EDC's, the company's or the school's own statement as of its date. The 2025 bond figures are a proposal, since the City's page does not show the vote. The rows describe public and private projects; none of them is a job of ours.

Highways, Power Lines and Water Projects Around Arlington

TxDOT's Fort Worth District finished two SH 360 projects through Arlington in 2021 and 2023, and its pages list what comes next. The SH 360 corridor page records the $233 million I-30/SH 360 interchange reaching substantial completion in December 2023, and the Southeast Connector page prices that project at $2.3 billion for roughly 16 miles of I-20 and I-820, finishing in an estimated 2028. TxDOT's proposal to rebuild I-20 between Park Springs Boulevard and SH 161 carries a $434 million estimate but no construction funding. Oversize loads in Tarrant County also run on TxDMV's clock: no weekday moves between 7 and 9 a.m. or between 4 and 6 p.m., though mobile cranes are exempt, and the permits for such moves are explained under heavy hauling and machinery moves.

The power and water networks are growing alongside the roads. A Notice of Approval for Oncor's Division 138 kV transmission line project was signed on January 26, 2026; the project strings a new double-circuit line on steel monopoles across parts of Arlington and Grand Prairie. Oncor's Liggett Switch to Skyview Switch 345 kV project, near Trinity Boulevard and SH 360, expects a Public Utility Commission decision in February 2027. Crane work near lines like these falls under OSHA section 1926.1408 and under the State of Texas's six-foot clearance law, Health and Safety Code chapter 752. On the water side, the Trinity River Authority's Central Regional plant holds a permit for 189 million gallons a day and serves 20 cities in whole or in part, Arlington included.

Project Published figures Published by Date
Southeast Connector (I-20, I-820 and US 287) $2.3 billion; approximately 16 miles of I-20 and I-820 rebuilt and widened, with 10 I-20 mainlanes between I-820 and US 287 and the I-20, I-820 and US 287 interchanges reconstructed; done by an estimated 2028 TxDOT project page No page date shown; status as of October 2026
I-30/SH 360 interchange $233 million direct-connect interchange; Six Flags Drive bridge over I-30 widened from two lanes to five; awarded November 2015; substantial completion December 2023 TxDOT project page No page date shown; status as of October 2026
SH 360, Abram Street to south of I-20 $53 million, 5-mile widening adding one mainlane each direction; construction began summer 2018; substantial completion April 2021 TxDOT project page No page date shown; status as of October 2026
SH 360, I-30 to SH 121 Mainlanes, frontage roads, bike lanes and sidewalks under schematic design and environmental assessment TxDOT project page No page date shown; status as of October 2026
I-20, Park Springs Boulevard to SH 161 Proposed rebuild adding one mainlane each direction; estimated construction cost $434 million; not currently funded for construction TxDOT project page No page date shown; status as of October 2026
I-20 Arlington/Grand Prairie Corridor Study US 287 in Tarrant County to east of South Carrier Parkway in Dallas County; evaluating added mainlanes and express lanes; public hearing not yet scheduled TxDOT project page No page date shown; status as of October 2026
I-820 East Loop SH 121/183 to Randol Mill Road; $174 million; substantial completion in 2024 TxDOT project page No page date shown; status as of October 2026
World Cup mobility improvements, Arlington $18.5 million with the North Central Texas Council of Governments, including 38 traffic detection systems, pedestrian countdown heads at 40 intersections and 139 streetlights installed or upgraded City of Arlington October 15, 2026
Johnson Creek Tributary 9 drainage More storm drain and channel capacity between N. East Street and AT&T Stadium Parking Lot 11; construction scheduled to begin in 2027 City of Arlington project page No date shown
Oncor Division 138 kV line, Arlington and Grand Prairie New double-circuit 138 kV line on steel monopole structures from a proposed Division Substation near Division Street and Stadium Drive; application filed August 7, 2025 (Docket No. 58453); Notice of Approval signed January 26, 2026 Oncor project page No page date shown
Oncor Liggett Switch to Skyview Switch 345 kV line, Dallas and Tarrant Counties Proposed Skyview Switch about one-quarter mile southwest of Trinity Boulevard and SH 360; application anticipated November 2026; PUC decision anticipated February 2027 Oncor project page No page date shown; public meeting July 16, 2026
Trinity River Authority Central Regional Wastewater System Treatment permit for 189 million gallons a day; 495-acre site next to the Trinity's West Fork; 20 cities served in whole or in part, Arlington among them, plus DFW Airport Trinity River Authority No date shown
Tarrant Regional Water District Cedar Creek Section 2 pipeline About 11 miles from Mansfield to Midlothian in 90-inch and 102-inch welded steel pipe; estimated cost $155 million; completion projected for 2028 City of Mansfield November 14, 2025

TxDOT's project pages print no page date, so costs and status are as the pages read in October 2026. Oncor, the Trinity River Authority and the cities describe their own projects. Status changes; check the agency's page before planning a move or a lift beside the work.

Big Projects in the Ten Nearby Cities

Factories, data-center campuses, schools and interchanges fill the nearby-city rows, each from a city, a school district, a state agency or the owner, with one news report marked as such. Fort Worth's city page on data centers counts four developments in 10 individual buildings with more than 3 million square feet, one more under construction, and a council resolution that starts the legal process for a moratorium on new applications. In Grand Prairie, a registration with the Texas Department of Licensing and Regulation puts Poly-America's new manufacturing building at $30,000,000, due June 30, 2027. Mansfield calls its Staybolt Street Entertainment District a $2.5 billion mixed-use development with a stadium of approximately 7,000 seats; a Mansfield Economic Development Corporation release gives a different seat count, so the table uses the City's.

At L.D. Bell High School in Hurst, Hurst-Euless-Bedford ISD is building the new school while classes continue on campus, with demolition of the old building planned from late 2028 through mid/late 2029, so any lift or delivery there works around an operating school. The same district broke ground on Trinity High School work in Euless on May 1, 2025, and Bedford's 2023 financial report puts $20 million of infrastructure behind the 30-acre Bedford Commons. In Cedar Hill the job is civil: TxDOT lists a US 67 interchange at Lake Ridge Parkway from summer 2026 to spring 2029, and Kennedale plans a gabion wall along Village Creek for 2027 and 2028. For street rules, the permit guide's nearby-city section lists what Fort Worth, Irving, Grand Prairie and Mansfield publish.

City Project Published figures Published by Date
Grand Prairie Lockheed Martin missile plant expansion $300 million; adds 100,000 sq ft of new space and turns 85,000 sq ft of offices into factory floor Defense News October 16, 2026
Grand Prairie Poly-America new manufacturing building (Building 9) Estimated cost $30,000,000; start April 1, 2026; completion June 30, 2027 Texas Department of Licensing and Regulation registration Registered 4/17/2026
Mansfield Staybolt Street Entertainment District $2.5 billion mixed-use development; stadium seating approximately 7,000; hotels of 175 and 150 rooms scheduled to open in winter 2027 City of Mansfield No date shown
Burleson Paris Baguette USA plant, HighPoint Business Park New North American manufacturing plant with 450 new jobs and a $175 million investment City of Burleson FY26 budget message September 8, 2025
Irving PowerHouse Irving data center campus 201 MW maximum utility power on 50 acres; 946,200 developable sq ft in up to three buildings; construction and delivery Q1 2025 to Q1 2027 PowerHouse Data Centers No date shown
Fort Worth Fort Worth Convention Center expansion, Phase II Estimated at $606 million; construction expected from late 2026 through early 2030 City of Fort Worth release December 8, 2025
Fort Worth Data centers inside city limits Four developments in 10 individual buildings with more than 3 million sq ft; one more under construction and four proposed; moratorium process started by council resolution City of Fort Worth No update date shown; newest item September 29, 2026
Fort Worth New JPS hospital, South Main Street Groundbreaking April 16, 2026; opening listed for 2030 JPS Health Network No date shown
Kennedale Valley Ln. streambank stabilization, Village Creek Gabion wall along the right bank; budget $2,734,000.00 with a FEMA grant; construction early spring 2027 to December 2028 City of Kennedale street projects page No date shown
Cedar Hill US 67 interchange at Lake Ridge Parkway, Phase 1 Construction start summer 2026; estimated completion spring 2029 TxDOT Dallas District construction list File dated June 2026
Euless Trinity High School rebuild Groundbreaking May 1, 2025; phase 2, a new cafeteria and academic wing, runs 22 months from mid/late 2026 through mid-2028 Hurst-Euless-Bedford ISD No date shown
Bedford Bedford Commons Planned 30-acre mixed-use development of restaurants, retail, office, entertainment and townhomes in a tax increment reinvestment zone; $20 million in infrastructure improvements, starting with the full reconstruction of Parkwood Drive City of Bedford 2023 Annual Comprehensive Financial Report Fiscal year ended September 30, 2023
Hurst L.D. Bell High School rebuild Groundbreaking March 26, 2025; new building estimated for May 2028; demolition of the old building planned late 2028 through mid/late 2029; classes continue on campus Hurst-Euless-Bedford ISD No date shown

Each row is the city's, the agency's, the school district's or the owner's statement as of its date, or a state registration; the Lockheed Martin row is a Defense News report. The rows show what is being built near Arlington, not work of ours.

Weather That Sets Lift Days in Arlington

Heat sets the hours of a lift day and storms set the dates. In a normal year, by NOAA NCEI's 1991-2020 figures, Arlington Municipal Airport reaches 100 degrees F on 21.9 days against 20.3 at DFW Airport, and the Weather Service's Fort Worth office dates DFW's first 100-degree day to July 1 and the last to August 27 on average. Its provisional count for DFW in 2026 reached 52 such days. The office's DFW normals and extremes table has thunderstorm days peaking in May and puts April at the top for mean wind, and under NWS Instruction 10-511 a Severe Thunderstorm Warning goes out for hail 1 inch or larger or gusts reaching 58 mph.

Wind is where the numbers meet OSHA's rules. Under 29 CFR 1926.1417(n), wind, ice and snow are the competent person's to account for, by changing the setup or the work to protect stability and rated capacity, and under 29 CFR 1926.1417(h) a local storm warning puts the same person in charge of deciding whether to secure the crane as its manufacturer recommends. 29 CFR 1926.1431 brings in a qualified person whenever wind at a personnel platform, sustained or gusting, passes 20 mph, and that person decides whether workers can be lifted. Liebherr says crane load charts generally hold only while gusts stay within 20 mph, and that work halts once the wind tops the chart's permissible speed. We follow the forecast, call off a lift when wind or weather, in the judgment of the operator or competent person, has made it unsafe, and write those limits into the lift plan.

Measure Value Source and date
Normal yearly count of days reaching 100 degrees F (1991-2020) 20.3 at DFW Airport; 21.9 at Arlington Municipal Airport NOAA NCEI 1991-2020 U.S. Climate Normals (data retrieved October 2026)
Normal yearly count of days with a freezing low, 32 degrees F or colder (1991-2020) 29.2 at DFW Airport; 35.6 at Arlington Municipal Airport NOAA NCEI 1991-2020 U.S. Climate Normals (data retrieved October 2026)
Days at DFW reaching 100 degrees F in 2026 52, tied with 1954 for fifth-most; provisional, subject to change through the end of the warm season NWS Fort Worth/Dallas, Annual and Consecutive Occurrences, updated September 22, 2026
August 2026 at DFW (days at or above 100 degrees F; temperatures in degrees F) 27 such days; highest 109 on August 23; average high 102.1 against a normal of 95.8 NWS Fort Worth/Dallas climate summary for August 2026, issued September 1, 2026
Fastest 5-second gust on 2024-05-28 (mph) 77.0 at DFW Airport and 77.0 at Arlington Municipal Airport, both from the north NOAA NCEI daily summaries (GHCN-Daily), data retrieved October 2026
Fastest 5-second gust on 2025-08-04 (mph) 89.0 at DFW Airport; 61.1 at Arlington Municipal Airport NOAA NCEI daily summaries (GHCN-Daily), data retrieved October 2026
Highest 3-second gust listed for each month at DFW, top four entries (mph) 89 in August 2025; 79 in March 2019; 78 in February 2000; 77 in May 2024. The table's Annual line reads 79, March 2019 NWS Fort Worth/Dallas, DFW Normals, Means and Extremes (page metadata July 5, 2023; entries through 2025)
Mean wind speed at DFW (mph) 12.3 in April, the windiest month; 8.6 in September, the calmest; 10.5 for the year NWS Fort Worth/Dallas, DFW Normals, Means and Extremes (page metadata July 5, 2023; entries through 2025)
Annual average wind speed in 2025 (mph) 10.1 at DFW Airport; 8.3 at Arlington Municipal Airport NOAA NCEI Global Summary of the Year, data retrieved October 2026
Days with thunderstorms at DFW (average) 46.5 a year; most in May (7.7); fewest in December and January (1.3 each) NWS Fort Worth/Dallas, DFW Normals, Means and Extremes (page metadata July 5, 2023; entries through 2025)
Tornadoes by month, North and Central Texas, 1950-2025 April 555 and May 525, the most; the fewest, 26, in July; the office's area averages 26 a year NWS Fort Worth/Dallas Tornado Climatology (1950-2025 table)
Kennedale-Arlington tornado, April 3, 2012 EF-2 with estimated maximum winds of 135 mph; 4.6-mile path about 150 yards wide, from Kennedale to near Lake Arlington NWS Fort Worth/Dallas event pages (updated October 16, 2015)
Lowest temperature in the February 2021 winter storm at DFW (degrees F) -2 on February 16, 2021, with 139 straight hours at or below freezing from February 13 to 19 NWS Fort Worth/Dallas February 2021 event page (page metadata February 12, 2023)
NWS wind products (typical values) Wind Advisory: "Sustained wind speeds of 30 to 39 mph lasting for 1 hour or longer". High Wind Warning: "sustained wind speeds of 40 mph or greater lasting for 1 hour or longer" or "winds of 58 mph or greater for any duration" National Weather Service Instruction 10-515, issued May 16, 2025

NOAA NCEI's station data and the NWS office's tables are separate products, so their gust figures sit on separate rows: NCEI reports a fastest 5-second gust, the NWS table a 3-second gust, and the two list different directions for August 2025. The 2026 heat counts are provisional. None of these values is a crane's wind limit; that comes from the manufacturer's load chart.

Sources & Methodology

Every figure above was taken from the primary sources below (accessed 2026-10-24). Where a number is derived (arithmetic on published figures) or covers a broader period or area, the text says so.

  1. City of Arlington: City Council Approves Agreement to Extend Dallas Cowboys Lease (April 21, 2026) — The lease extension terms: the team's minimum investment, the completion deadline and the City's contribution.
  2. Texas Rangers: Globe Life Field Facts & Figures — Roof, height, steel, seating and cost figures for Globe Life Field; no page date shown.
  3. National Medal of Honor Museum, official site — The museum's own site; the building figures in section 1 come from the City of Arlington and Texas Highways.
  4. City of Arlington: Topping Out Ceremony Marks Progress on E-Space Project (October 23, 2026) — Topping out, jobs and the completion estimate for the plant and hangar at Arlington Municipal Airport.
  5. General Motors: Arlington Assembly facility page — What the plant builds and the year it opened.
  6. TxDOT: Southeast Connector — Cost, length, lane counts and the estimated completion for the I-20, I-820 and US 287 rebuild.
  7. TxDOT: SH 360 corridor — The I-30/SH 360 interchange, the SH 360 widening south of Abram Street and the next SH 360 phase.
  8. City of Fort Worth: Data Centers — Fort Worth's count of data center developments, its pipeline and its moratorium process.
  9. City of Mansfield: Staybolt Street Entertainment District — The district's published value, stadium seating, hotels and opening targets.
  10. NWS Fort Worth/Dallas: DFW Normals, Means and Extremes — Mean wind by month, peak gusts by month and thunderstorm days at DFW.
  11. NWS Fort Worth/Dallas: Annual and Consecutive Occurrences of 100-degree days — Yearly counts of 100-degree days at Dallas/Fort Worth, with the provisional 2026 count.
  12. NOAA NCEI: 1991-2020 U.S. Climate Normals documentation — Defines the normals used for DFW Airport and Arlington Municipal Airport; the station values come from NCEI's data service.
Need a hand?

Lifting in Arlington or a nearby city? Send us the load's weight, its pick and set points and your dates for a free written quote.

Quick Answers

How many 100-degree days does Arlington get in a year?

In an average year, 21.9 at Arlington Municipal Airport and 20.3 at DFW Airport, according to NOAA NCEI's 1991-2020 climate normals. The National Weather Service office in Fort Worth gives July 1 as DFW's average first 100-degree day and August 27 as its average last. Some years run far past that: the office counted 52 days at DFW in 2026, tied with 1954 for fifth-most, and it marks the 2026 figure as subject to change until the warm season ends. On a lift, the heat mostly moves the working hours, and OSHA's heat guidance for employers starts with water, rest and shade.

How strong do wind gusts get in Arlington?

Strong enough to stop crane work on some days. NWS Fort Worth/Dallas lists April as DFW's windiest month, with a mean of 12.3 mph, but the gusts are what matter. NOAA NCEI's daily records put the peak gust on May 28, 2024 at 77 mph at DFW and the same 77 mph at Arlington Municipal Airport, and they show 89 mph at DFW in August 2025. Liebherr says crane load charts generally hold only up to 20 mph gusts, and under OSHA section 1926.1431 a qualified person must decide before workers are lifted once wind at the platform tops 20 mph. Wind delays are rebooked under the standby terms set out in your written quote.

What major construction is happening in Arlington, TX?

Several large projects are under way or announced, by the City's and the Arlington EDC's own notices. The City reports that the E-Space plant and hangar at the city's airport topped out on October 23, 2026, with the work expected to wrap up in summer 2027. Under the lease extension approved on April 21, 2026, the Dallas Cowboys will put a minimum of $750 million into AT&T Stadium, with the work done by 2043. Anthem, the 43-acre redevelopment of the former Lincoln Square, is slated for early 2028, and a downtown project near Abram and Mesquite streets must start construction by September 2027. We list these as their owners describe them; none is a project of ours.